Jetstream 31 service manual

BAE Jetstream 31/32 - Hayward & Green

The approach was flown with full flap and the gear locked and confirmed down by the three green gear indicators.

Red River College's aircraft maintenance program

The landing weht was estimated to be 13,448 lb (6,099 kg) and the crew reed that the Vref was about 105 kt.

Red River College's aircraft maintenance program

Transportation Safety Board of Canada - Aviation Investation

The flht had been routine and the crew were flying a day, visual approach to runway 26, in good weather, with the surface wind reported as 210 at 14 kt.

BAe Jetstream 31 production list - Rzjets

A BAe Jetstream 31 turboprop plane sustained damage when the starboard undercarriage failed on landing at Ronaldsway Airport, Isle of Man. Flht NM309 had departed Leeds/Bradford Airport (LBA), UK on a flht to Ronaldsway Airport (IOM).


Jetstream 31 service manual:

Rating: 95 / 100

Overall: 90 Rates